Cassell Consulting - Construction Estimating Consultant
  • Home
    • About
  • TrainingCassell Consulting offers Timberline Estimating and Primavera SureTrak Training throughout the Pacific Northwest, Alaska, & Hawaii. Client Testimonials from our Training “At first, I thought the consulting was going to cost us too much…but when Barry was done, we were estimating twice as many projects, with the same personnel…it paid for itself several times over, in just the first year”- Mark Kobos, GM, Quality Construction “Class proceeded in a logical, well thought-out manner, and dealt with everything from the basics for the first-time user, to the more complicated steps for the seasoned professional.” – Mel Cody, Sr. Estimator, Earth Tech Inc. , Richmond, VA “I didn’t think we had 3 days to schedule the time – I now wonder how we got by without knowing what we learned……The class paid for itself with just one or two new ideas we left with.” – Larry Jenkins, Chief Project Manager/ Gen, Mgr., Inland Construction Co., Spokane WA “In just our first two-day class, Barry got our guys to use SureTrak to do things we didn’t know it could even do.” – Dan Ching, President K-D Construction, Honolulu, HI “In our case, I don’t see much room for improvement. Barry read the level…
    • Training Schedule
    • Primavera P6 for Goverment Contracts
    • P6 Accelerated Intermediate Training
    • P6 Project Manager for Contractors
    • Sage Timberline Software Training
    • US Cost Success Estimator Training
  • Products
    • Primavera P6
    • WinEx by RocTek
    • DProfiler
    • Timberline Estimating
    • OnScreen Takeoff
    • US Cost Success Estimator
    • iPM Global
    • WinEst Modelogix
  • Consulting
  • Custom Apps
    • ContractorHub
  • P6 Scheduling
  • Blog
  • Technical Tips“Bridging the Technology Gap with Real – World Solutions” Cassell Consulting specializes in Technology Consulting for Contractors using Timberline & Primavera. Barry Cassell, owner of Cassell Consulting, has 30 years of industry experience including nearly 20 years of estimating, scheduling, & project management software implementation and training. “Barry brings into the classroom his first-hand knowledge of having done what we do on a daily basis…(his) classes were an invaluable help to us.” – Daryl Arita, Managing Partner, Arita-Poulson General Contractors, Honolulu, Hawaii Whether you want to train staff, improve & optimize your current estimating software, or are considering upgrading your existing systems, Cassell Consulting will make the transition smooth and profitable.
    • CSI Masterformat 2010 Sample Cost Codes
    • The Five Basics of Fundamentally Sound Construction Operations
    • Estimating Controls
    • Timberline
      • Bid Day Emergency – File won’t open
      • Timberline Estimating Issues & Solutions
      • Refresh Timberline Rate Tables in an Estimate
      • Index Database to Masterformat ’04
    • Primavera P6
      • Schedule Configuration for USACE
      • Convert P3 Files to P6
    • US Cost
      • Add Macro to Menu
  • LinksConstruction Estimating Software Advice
  • Meet Us
    • Barry Cassell, CEO
    • Rob Mazoros
    • Chelsea Cassell
  • ContactPlease use the form below to contact us. [raw]
    [/raw]
Search

Home / Technical Tips

Construction Estimating Articles by Topic

Construction Market

Consulting

Estimating

Primavera

P6 Project Manager Tip

Project Management

Scheduling

SureTrak

Timberline

Timberline Estimating Tips

Us Cost

WinEst

Search Our Site

Tips & Articles

  • Construction Software
  • Five Predictions for 2012
  • Reconcile Bi-Directional Currency Conversions in US Cost

Contact

Email Barry
Phone 360.891.5811

Fax 866.457.8026

Cassell Consulting

PO Box 821590

Vancouver, WA 98682

Barry Cassell

2010 CSI Masterformat Cost Codes

We’re sharing a more generic list of 2010 Masterformat Sample Cost Codes as a guideline for mid & smaller GC’s. Click here

Recent Posts

  • Construction Software
  • Five Predictions for 2012
  • Reconcile Bi-Directional Currency Conversions in US Cost
  • P6 Activity Won’t Schedule On Time
  • How to Find and Recover a Lost Estimate in Timberline

Categories

Construction Market Consulting Estimating P6 Project Manager Tip Primavera Project Managment Scheduling SureTrak Timberline Timberline Estimating Tip Uncategorized US Cost WinEst
© Cassell Consulting 2011 | Site by DouglasCreativeSolutions.com